The county is correcting a previously approved contract, changing the vendor name from ECON Development, Inc. to LASS Engineering and Construction, Inc. for countywide earthen and concrete channel repair work for the Flood Control District, covering April 1, 2026 through March 31, 2027, at $7,000,000.
What it means for you
A clerical correction ensures the right company — LASS Engineering and Construction, Inc. — is listed on the flood channel repair contract instead of ECON Development, Inc.
Outcome
A motion was made by Commissioner Ellis, seconded by Commissioner Garcia, that this item be approved. The motion carried by the following vote: (5-0)
How each member voted
Lina Hidalgo (County Judge): AyeRodney Ellis (Commissioner, Precinct 1): AyeAdrian Garcia (Commissioner, Precinct 2): AyeTom S. Ramsey (Commissioner, Precinct 3): AyeLesley Briones (Commissioner, Precinct 4): Aye
5–0, per the official record.